曰批全过程免费视频在线观看无码,久久精品人妻中文系列,国产最新进精品视频,japanese人妻中文字幕

CAPACITY
CAPACITY
CAPACITY
Design and development capability
R&D personnel

4 senior engineers, 5 design engineers, 1 welding engineer, 1 non-destructive testing engineer, 1 material engineer, 12 assistant engineers, 2 pressure vessel A1 and A2 auditors

Design software

Using the HYSYS software platform, integrating process feedback data from numerous petrochemical LNG, coke oven tail gas and other projects, constructing a high-precision physical property unit library, and achieving precise simulation design of resistance and heat transfer performance; Synchronize stress analysis to ensure product strength requirements.

Research and design of new high pressure fins

Developing a new type of fin structure, which has been systematically verified to reduce the volume of the heat exchange unit by 20% -30% compared to similar models in China under the same heat load. It has high performance and balances reliability and energy efficiency advantages.

Manufacturing capability
Monthly production capacity reaches 680 tons

The maximum monthly production capacity is 680 tons. There are a total of 8 vacuum brazing furnaces, including 3 large vacuum brazing furnaces with a maximum brazing size of 10000 * 1500 * 1700mm

Senior technical team

Gathering a senior domestic technical team, with core members including brazing process experts and over 40 years of industry experience

Standardized operation throughout the entire process

Establish standardized operating procedures for the entire process of heat exchanger manufacturing, equip with professional automated welding production lines, and achieve breakthroughs in both process innovation and production quality and efficiency.

/